Clayton State Athletics Renovation Video Galleries
In April of 2018, Clayton State Athletics began an extensive renovation of The Loch that includes new locker rooms for each team, a student-athlete lounge and a complete reconstruction of the lobby. The latter will include a self-contained concession area, digital signage and televisions.
Additional areas within the project include the removal of the current women's basketball locker room to expand the lobby, installation of free-standing trophy cases and the conversion of the current men's basketball locker room to an educational multi-purpose space.
A second educational area, as well as additional office space, will be added in the current footprint of the existing weight room while new equipment will be added to improve the use of the new weight room space following the completion of the renovations.
The Athletics project is part of an overall Campus Core construction plan and is expected to conclude prior to November of 2018.
Follow the progress below with videos throughout the entire process.
Â
Â
|
Behind The Scenes Point of View Walkthrough No. 6 (8/31/18) |
|
Removal and Installation of New Windows (8/16/18) |
|
Behind The Scenes Point of View Walkthrough No. 5 (8/3/18) |
|
Basketball Suite Wall Construction (7/27/18) |
|
Visiting Team Changing Room Wall Construction (7/24/18) |
|
Student-Athlete Lounge Wall Construction (7/24/18) |
|
Women's Locker Room Wall Construction - No. 2 (7/20/18) |
|
Behind The Scenes Point of View Walkthrough No. 4 (7/13/18) |
|
Women's Locker Room Wall Construction (7/9/18) |
|
Athletic Training Room Wall Construction (7/3/18) |
|
Behind The Scenes Point of View Tour No. 3 (7/3/18) |
|
Men's Locker Room Wall Construction (6/28/18) |
|
Behind The Scenes Point of View Tour No. 2 (6/27/18) |
|
Cement is Poured for Walls in Women's Locker Room (6/26/18) |
|
Cement is Poured for Walls in Men's Locker Room (6/24/18) |
|
Behind The Scenes Point of View Tour No. 1 (6/14/18) |
|
Construction of Walls for Clayton State Athletic Training Center (6/14/18) |
|
Clayton State Basketball Suite Wall Demolition (5/31/18) |
|
Clayton State Basketball Locker Room Post Demolition (5/21/18) |
|
Clayton State Sports Information Office Wall Demolition (5/11/18) |
|
Clayton State Women's Basketball Wall Demolition (5/11/18) |
|
Clayton State Men's Basketball Locker Room Demolition (5/9/18) |
|
Clayton State Athletics Men's Locker Room Wall Removal (4/27/18) |
Updated 3:05 p.m. Tuesday, July 10, 2018
Â